Loading...
The Shipping ( Load Lines) Regulation, 2011
summer freeboard is increased such that the resulting draught is not more than that corresponding to a minimum summer freeboard for the sarc e ship, but with an assumed fresboard deck located a distance below the actual freeboard deck at least equal to th
The Shipping ( Load Lines) Regulation, 2011
summer zones. however, for ships of 100 metres (328 feet) and under in length, the area north of latitude 44°n is a winter seasonal area. . seasonal periods: | | . winter: 1 december to 28/29 february . summer: 1 march to 30 november 1 (3) mediterran
The Shipping ( Load Lines) Regulation, 2011
summer . .mm (s) upper edge of line through centre of ring winter mm (w) mm below (8) winter north atlantic ' mm (wna) mm below (s) timber tropical mm (lt) mm above (ls) timber summer mm (ls) mm above (s) timber winter mm (lw) mm below (ls) timber winter
The Registration of Titles, Cadastral Mapping and Tenure Clarification (Special Provisions) (Section 5-Part of Summer Hill, Saint Ann) Order, 2013
summer hill, saint ann) order, 2013 in exercise of the power conferred upon the minister by section 5 of the registration of titles, cadastral mapping and tenure clarification (special provisions) act, 2005, the following order is hereby made:? 1. this
The Registration of Titles, Cadastral Mapping and Tenure Clarification (Special Provisions) (Section 5-Part of Summer Hill, Saint Ann) Order, 2013
summer hill, in the parish of saint ann butting and bounding as appears by survey pre-checked plan bearing plan examination number stated in the table below as follows: applicant plan parcel place name number size (m?) name parish volume velcita
The Registration of Titles, Cadastral Mapping and Tenure Clarification (Special Provisions) (Section 5-Part of Summer Hill, Saint Ann) Order, 2013
summe . metres 10 5 0 10 20 30 40 50 metres scale : 1cm to 5m r.f. 1/500 remarks: 1. cal and d dis f by ? 2. all marks ore iron pegs unless where. otherwise stated, 3. all boundaries are open unless where otherwise stated, 4. the offset is to the southeas
The National Water Commission Act
summerset gully to the centre line at east kings house road then south-easterly thence south-easterly along the centre line at east kings house road to its intersection with hope road. south-easterly along lady musgrave road for 200 feet thence south-west
The National Water Commission Act
summerset lane in an eastern direction from the intersec- tion of the west end road over a length of 500m; 3.9km from the negril round-a-bout along the west end road to a point locally known as country side in an eastern direction from the intersection of